Power and data cable segregation is one of the first things an inspector or client checks on a containment route, and for good reason. A data cable running alongside a power cable can pick up interference, and data cable insulation is not designed for mains voltage. Two standards apply at the same time, each with its own purpose. Below: what they ask for, five practical options, the right divider height and how to cross routes.
Why segregate power and data cables?
Three reasons, each asking for something slightly different:
- Safety. Data cables are insulated for low voltages. If a damaged power cable touches a data cable, mains voltage can end up on the data network.
- Interference. Current in a power cable creates a magnetic field. Over a long parallel run, that field can induce noise in copper data cables.
- Maintenance. Electricians and network installers prefer to work in their own tray. Separate routes are easier to follow when changes come.
Fibre drops out of the second point: it carries no current and picks up no interference. The other two points still apply, because heavy power cables can damage it.
What do BS 7671 and BS EN 50174-2 require?
BS 7671 covers electrical safety [1]. Regulation 528.1 deals with the proximity of Band I circuits (extra-low voltage such as data and telecoms) to Band II circuits (low-voltage power). They must not share a wiring system unless they are segregated or every cable is insulated for the highest voltage present. Fire alarm and emergency lighting circuits have their own segregation requirements in BS 5839-1 and BS 5266-1 [2][3].
BS EN 50174-2 covers the installation of information technology cabling [4]. It sets a minimum separation between power and data cables that depends on three things:
- the screening of the data cable, expressed as a segregation classification;
- the number and type of power circuits;
- the type of separation: free air, open metal containment, perforated metal containment or a solid metal divider.
Better screening and a more solid barrier both allow a smaller distance. Take the figure for your project from the table in the standard. Without cable data, an early layout can work with 300 mm between open trays without a divider (rule of thumb, indicative).
Record the chosen solution in the specification and on the drawing, with the distance or divider type per route. The installer then knows what to supply and the client can verify it at handover.
What are the options on site?
| Option | When | Watch out for |
|---|---|---|
| Separate trays on separate tiers | New build, data centres, high cable counts | 300 mm between tiers (rule of thumb, indicative) |
| Separate trays side by side | Single tier with enough width | Distance to BS EN 50174-2 |
| One tray with a divider | Tight space, few circuits | Divider continuous through bends and tees |
| Screened data cable (S/FTP) | Long parallel runs, noisy environments | Bond the screen properly |
| Fibre | Backbone, long distances | Mechanical protection, own containment |
Practical overview, indicative. The standard and the specification govern.
Separate tiers are the most generous option and the easiest to extend, which is why they are common in data halls. See data centre cable management.
How high should a tray divider be?
A divider only works if cables cannot ride over it. Choose a divider at least as high as the cable pile on either side (rule of thumb, indicative). Manufacturers supply dividers to suit each containment size:
| Containment | Tray depth or side rail | Divider height |
|---|---|---|
| Cable ladder | 60 mm | 35 mm |
| Cable ladder | 100 mm | 75 mm |
| Cable ladder | 150 mm | 120 mm |
| Cable tray | 60 mm | 58 mm |
| Cable basket | 35, 60 or 100 mm | 25, 50 or 80 mm |
Manufacturer data [5][6][7]. Dividers come pre-galvanised, hot-dip galvanised and stainless.
Three points on installation:
- Continuous. The divider runs through bends, tees and reducers. A gap at a fitting is a gap in the segregation.
- Fixed. Fix it with the manufacturer’s fixing set so it does not tip over when cables are added. A typical set is an M8×15 slot bolt with nut and washer, three per 3 m length [5].
- Fill per compartment. Work out the fill for each side of the divider. See cable tray fill calculation.
How do you cross power and data routes?
Sometimes routes have to cross. Make them cross at right angles (rule of thumb, indicative), which keeps the length where the cables run close together as short as possible.
Take one route over the other with an inside and outside riser, so the trays do not touch, and keep the BS EN 50174-2 separation at the crossing too. On a multi-tier trapeze, giving power and data their own level usually means they only ever cross at right angles, at branch points.
What mistakes come up most with segregation?
- Divider stops at the fitting. Through bends and tees, power and data end up touching after all.
- Bundled together on the last stretch. At the branch to a device, power and data are often tied together. Keep the segregation there too.
- Screen not bonded. An S/FTP cable only screens properly when the screen is bonded at the panel.
- Fire alarm cables mixed in. Fire alarm and emergency lighting circuits have their own segregation rules in BS 5839-1 and BS 5266-1 [2][3]. Run them separately.
- Data compartment full. Once the data side is full, fitters start using the power side. Keep each compartment at 40% fill (rule of thumb, indicative).
What does the configurator check?
In the Cables step you add cables to each tray. If power and data share a tray without a divider, the configurator flags it. It does not block your request: you can add a divider or split the cables over two trays. Fill per tray is shown straight away as well.
Where do these figures come from?
- BS 7671, Requirements for Electrical Installations (IET Wiring Regulations), regulation 528.1.
- BS 5839-1, Fire detection and fire alarm systems for buildings. Code of practice for design, installation, commissioning and maintenance of systems in non-domestic premises.
- BS 5266-1, Emergency lighting. Code of practice for the emergency lighting of premises.
- BS EN 50174-2, Information technology. Cabling installation. Installation planning and practices inside buildings.
- Eurostrut, product pages for cable ladder dividers ECL60, ECL100 and ECL150 (35, 75 and 120 mm, M8×15 fixing set). Accessed 19 November 2026. https://eurostrut.com/scheidingsschot-recht-kabelladder-ecl100-tv/ESD100-HDG
- Eurostrut, product page for ECT60 cable tray divider (58 mm). Accessed 19 November 2026. https://eurostrut.com/scheidingsschot-kabelgoot-ect60-rvs304/ECTDIV60-SS304
- Eurostrut, product page for click-fit wire basket divider (25, 50 and 80 mm). Accessed 19 November 2026. https://eurostrut.com/rejiband-scheidingsschot-klikbaar-100-tv/67030612
Frequently asked questions
Can power and data cables share the same cable tray?
Yes, if they are segregated. Fit a continuous metal divider, including through bends and tees, or use cables insulated for the highest voltage present. BS EN 50174-2 then gives the minimum separation for the data cables.
What is the minimum separation between power and data cables?
It depends on the screening of the data cable, the number and type of power circuits and the type of containment or divider. BS EN 50174-2 gives the distance in a table. For an early layout without cable data, allow 300 mm between open trays without a divider (rule of thumb, indicative).
What are Band I and Band II circuits?
In BS 7671, Band I covers extra-low voltage circuits such as telecoms, data, signalling and bell circuits. Band II covers low-voltage circuits such as 230 V and 400 V power. Regulation 528.1 sets the rules for running them close together.
Does fibre need to be segregated from power?
Fibre carries no current and is immune to electromagnetic fields, so interference is not a concern. Heavy power cables can still damage it mechanically, so give fibre its own tray, tier or raceway.
https://strutconfigurator-site.pages.dev/en/knowledge-base/power-data-cable-segregation/ · Updated 19 November 2026 · Indicative; the manufacturer confirms.