# Cable tray fill calculation: formula, table and margin

URL: https://strutconfigurator-site.pages.dev/en/knowledge-base/cable-tray-fill-calculation/
Topic: Cable tray · Author: Ismail Yeşilay · Last updated: 2026-11-19

> A cable tray fill calculation divides the total cross-section of the cables by the cross-section of the tray. Use π/4 × d² per cable, add them up and divide by width × depth, or by the manufacturer's usable area. Design to about 40% fill at handover and stay below 60% as a rule of thumb.

A cable tray fill calculation tells you whether a containment route will still take cables in five years. Too tight and every new cable is a fight. Too generous and you hang more steel than you need. The maths is simple: add up the cable cross-sections and divide by the tray cross-section. This guide gives the formula, the cross-sections of common cables, capacity tables for UK basket sizes and the traps to avoid.

## What does cable tray fill mean?

Fill is the share of the tray's cross-section taken up by cables, as a percentage:

**fill = Σ (quantity × π/4 × d²) ÷ (width × depth) × 100%**

Here d is the overall cable diameter in mm, and width and depth are the internal dimensions of the containment. If the manufacturer publishes a usable cross-section, use that instead.

UK designers will know the 45% space factor used for enclosed trunking in IET guidance [3]. Open tray and basket work the same way in principle, but IEC 61537 sets no fill limit for them [4]. The limit comes from the specification or from good practice.

## How do you do the calculation step by step?

1. **List the cables** for each tray: type and quantity.
2. **Look up the overall diameter** on each cable datasheet.
3. **Work out the area per cable** with π/4 × d².
4. **Add them up** for everything in the tray.
5. **Divide by the tray cross-section** and multiply by 100%.

Common cables and their areas:

| Cable | Diameter | π/4 × d² | d² (conservative) |
|---|---:|---:|---:|
| Cat6A U/FTP | 7.5 mm | 44.2 mm² | 56.3 mm² |
| Cat6A S/FTP | 8.0 mm | 50.3 mm² | 64.0 mm² |
| OM4 patch lead | 2.0 mm | 3.1 mm² | 4.0 mm² |
| MPO-12 trunk (OM4 or OS2) | 6.0 mm | 28.3 mm² | 36.0 mm² |
| Power, 3-core 2.5 mm² | 10.5 mm | 86.6 mm² | 110.3 mm² |
| Power, 5-core 6 mm² | 16.0 mm | 201.1 mm² | 256.0 mm² |
| Power, 5-core 16 mm² | 22.0 mm | 380.1 mm² | 484.0 mm² |

*Diameters: rule of thumb, indicative (typical datasheet values), and the same values the configurator uses. The datasheet of the chosen cable governs.*

**Worked example.** A 450×55 mm cable basket with 120 Cat6A S/FTP cables and 48 MPO-12 trunks:

- Cat6A: 120 × 50.3 = 6,032 mm²
- Trunks: 48 × 28.3 = 1,357 mm²
- Total: 7,389 mm²
- Basket: 450 × 55 = 24,750 mm²
- Fill: 7,389 ÷ 24,750 = **30%**

Using the conservative d² method gives 9,408 mm² and 38%. Either way you are under 40%.

## What fill percentage should you design to?

Designers typically work with three bands. Check as well whether the specification or the client sets its own figure.

| Fill | Status | What it means |
|---:|---|---|
| up to 40% | OK | Room to grow, cables lie loose |
| 40–60% | Full | Adding cables is possible, with effort |
| above 60% | Over | Pulling in gets hard, heat and weight build up |

*Rule of thumb, indicative. The configurator uses the same bands.*

Power cables add a second limit. Cables packed closely together lose heat less easily, so their current-carrying capacity drops. BS 7671 Appendix 4 gives the grouping (rating) factors for that [1], based on IEC 60364-5-52 [2]. On a tray full of power cables, heat often sets the limit before space does.

## What size basket do you need?

Reverse the sum: divide the total cable area by 40% and pick the next size up. This table gives the number of cables of one type per size at 40% fill on width × depth:

| Basket (W×D) | Area | 40% | Cat6A U/FTP | MPO-12 trunk | 5-core 6 mm² |
|---|---:|---:|---:|---:|---:|
| 100×55 mm | 5,500 mm² | 2,200 mm² | 49 | 77 | 10 |
| 150×55 mm | 8,250 mm² | 3,300 mm² | 74 | 116 | 16 |
| 300×55 mm | 16,500 mm² | 6,600 mm² | 149 | 233 | 32 |
| 450×55 mm | 24,750 mm² | 9,900 mm² | 224 | 350 | 49 |
| 600×55 mm | 33,000 mm² | 13,200 mm² | 298 | 466 | 65 |
| 300×106 mm | 31,800 mm² | 12,720 mm² | 287 | 449 | 63 |
| 600×106 mm | 63,600 mm² | 25,440 mm² | 575 | 899 | 126 |

*Calculated from the diameters above (rule of thumb, indicative). UK basket depths of 30, 55 and 106 mm: manufacturer data [6].*

When in doubt, go deeper before you go wider. A 300×106 mm basket holds more than a 450×55 mm one and takes up less soffit width.

## Does wire basket count differently from solid tray?

Yes. Manufacturers publish a usable cross-section for wire basket that is smaller than width × depth. One lists 53,076 mm² for a 100×600 mm basket against 60,000 mm² nominal, or 88% [5]. At 40%, that basket takes about 480 Cat6A cables instead of 543.

On cable ladder, work with the internal side rail height. Power cables on ladder are often laid in a single layer, and then width matters more than area.

## What mistakes come up most in fill calculations?

- **Using the nominal size.** Internal dimensions are smaller than the nominal size, especially with thick sheet. Use the internal size or the manufacturer's usable area.
- **Using conductor size.** For a 5-core 6 mm² cable, use the overall diameter of the whole cable. The 6 mm² is a single conductor.
- **Forgetting the divider.** A divider splits the tray into two compartments. Calculate fill for each.
- **Ignoring planned growth.** Include cables already planned for the next phase.

## What else should you check besides fill?

- **Weight.** A full basket is heavy. 480 Cat6A cables weigh about 29 kg per metre (rule of thumb, indicative), which drives support centres. See [cable tray supports](https://strutconfigurator-site.pages.dev/en/knowledge-base/cable-tray-supports/).
- **Segregation.** Power and data in one tray need a divider. See [power and data cable segregation](https://strutconfigurator-site.pages.dev/en/knowledge-base/power-data-cable-segregation/).
- **PoE bundles.** Data cables carrying power over Ethernet warm up in large bundles. ISO/IEC TS 29125 deals with this effect [7], so keep bundles small.
- **Bend radius.** A full tray leaves less room for generous bends at drops.

In the configurator you add cables per tray in the Cables step and see the fill straight away, with the status OK, full or over.

## Where do these figures come from?

1. BS 7671, *Requirements for Electrical Installations* (IET Wiring Regulations), Appendix 4.
2. IEC 60364-5-52, *Low-voltage electrical installations. Part 5-52: Selection and erection of electrical equipment. Wiring systems*.
3. IET, *On-Site Guide* (BS 7671), cable capacities of conduit and trunking.
4. IEC 61537 (BS EN 61537), *Cable management. Cable tray systems and cable ladder systems*.
5. Eurostrut, product page for 100×600 mm wire basket: usable cross-section 53,076 mm². Accessed 19 November 2026. https://eurostrut.com/rejiband-draadgoot-100x600-hdg/60233600
6. Atkore UK, steel wire cable tray product pages (30, 55 and 106 mm deep). Accessed 19 November 2026. https://www.atkore.com/en-gb/products/cable-management-systems/MC55
7. ISO/IEC TS 29125, *Information technology. Telecommunications cabling requirements for remote powering of terminal equipment*.
8. Cable diameters and weights: typical datasheet values (rule of thumb, indicative). The datasheet of the chosen cable governs.

## Frequently asked questions

**How do you calculate cable tray fill?**

Add up the cross-sectional area of every cable (π/4 × diameter² each) and divide by the tray's cross-section. For example, 120 Cat6A S/FTP cables at 8.0 mm and 48 fibre trunks at 6.0 mm in a 450×55 mm basket give about 30% fill (diameters indicative).

**What is the maximum fill for cable tray?**

A common design figure is 40% at handover to leave room for growth, with 60% as the practical ceiling (rule of thumb, indicative). Check whether the specification sets its own limit. With power cables, heat often limits you before space does.

**How many Cat6A cables fit in a 300 mm cable basket?**

In a 300×55 mm basket at 40% fill, about 149 Cat6A U/FTP cables of 7.5 mm. That is 16,500 mm² × 40% = 6,600 mm², divided by 44.2 mm² per cable. Use the diameter from the cable datasheet.

**Is cable tray fill the same as trunking space factor?**

The idea is the same, the application differs. For enclosed trunking, IET guidance works with a 45% space factor. Open tray and basket have no fixed figure in the product standard, so designers work to a project limit such as 40%.

## Configure it yourself

https://strutconfigurator-app.pages.dev/?lang=en&systeem=kabels

---

Source: https://strutconfigurator-site.pages.dev/en/knowledge-base/cable-tray-fill-calculation/ · Last updated: 2026-11-19 · Loads are indicative; the manufacturer confirms.
Strutconfigurator is part of NEXTRIQ (Rotterdam).